Skip to main content

Texas toll road opening in 2018

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.
December 15, 2017 Read time: 1 min

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers. The project has been managed by the 2363 North Texas Tollway Authority. When the link opens to traffic it is expected to carry around 55,000 vehicles/day but this is expected to rise to 174,000 vehicles/day by 2030 due to growth in the area.

For more information on companies in this article

Related Content

  • India’s US$2.2 billion Mumbai Trans Harbour Link opens
    January 12, 2024
    India’s US$2.2 billion Mumbai Trans Harbour Link is being opened to traffic.
  • Texas Transportation tollway being previewed
    January 31, 2017
    A US$1.5 billion Interstate project is being put forward for approval in the US State of Texas. The LBJ East project is being proposed the city of Dallas and will be an 18km stretch of Interstate 635 that will connect Central Expressway with Interstate 30. The project has been planned by the Texas Transportation Department and is intended to boost capacity in the areas around Lake Highland, Garland, Far East Dallas and Mesquite. The proposed route calls for two of the seven lanes on the widened Interstate s
  • Key road link opens in San Antonio, Texas
    October 11, 2013
    A new road link in the Texan city of San Antonio will help future industrial development in the area. The new 2.7km connection provides a four-lane extension of 36th Street from Highway 90 into the centre of Port San Antonio at Billy Mitchell Boulevard. The new route will allow for the future closure of North Frank Luke Drive, a small road running parallel to the runway at Kelly Field, the port’s industrial airport. This will provide direct access to the airport from the port and the area will be suitable f
  • US$1.43 billion tolled expressway for Jakarta, Indonesia
    November 21, 2024
    A US$1.43 billion tolled expressway is planned for Jakarta, Indonesia.