Skip to main content

Texas toll road opening in 2018

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.
December 15, 2017 Read time: 1 min

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers. The project has been managed by the 2363 North Texas Tollway Authority. When the link opens to traffic it is expected to carry around 55,000 vehicles/day but this is expected to rise to 174,000 vehicles/day by 2030 due to growth in the area.

For more information on companies in this article

Related Content

  • Opening St Petersburg's key tollway ring road
    May 15, 2012
    A new section of Western High Speed Diameter (WHSD) highway from the Ring Road (KAD) to the Hyundai plant in Kamenka, has been opened to traffic in St Petersburg. The WHSD and KAD interchange will be completed by 2012 when the entire third phase of the highway will be built. The US$7.23 billion WHSD Tollway in the city is sponsored by the Federal Road Agency and it is said to be one of the most important means of solving the city’s transport problems. It is a strategic investment project to develop the ci
  • US$690 million for Indonesia toll tunnel
    September 3, 2024
    Funding worth US$690 million is planned for Indonesia’s toll tunnel.
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Construction commencing for new tollway for Philippines
    July 18, 2019
    Construction work is commencing on the project to build a new expressway link in the Philippines. The new road section will link the South Luzon Expressway (SLEx) and the North Luzon Expressway (NLEx). The project is costing nearly US$430 million to build and should be ready by 2021. The route will be 8km in length and will feature two lanes in either direction, reducing journey times considerably between the SLEx and the NLEx routes. The work is being carried out for Metro Pacific Tollways (MPTC).