Skip to main content

Texas road construction underway

A key Texas interstate construction project is underway.
By MJ Woof August 14, 2023 Read time: 1 min
Work is underway for improvements to a stretch of Interstate 35 in Austin, Texas – image courtesy of © Waingro | Dreamstime.com

Work is now underway for upgrading of another stretch of I-35 in Austin, Texas. This second stage of the I-35 improvement project is being carried out by contractor Pulice Construction.

The I-35 improvement project is seeing 45km of the route being upgraded at a total cost of US$5.65 billion. This second stage of the project being handled by Pulice Construction is a $606 million package of works. Pulice will add a new HOV lane in either direction to I-35 for the stretch between state from SH 45 North to US 290 East.

The Interstate 35 Capital Express North project is being managed by the Texas Department of Transportation (TxDOT) and should take five years to carry out. The project is intended to boost traffic flow and cut congestion. The highway currently experiences regular traffic delays for drivers. 

The work includes a new high-occupancy vehicle lane in each direction along I-35. Also included will be upgrade works for six bridges along the route. Ramps and intersections will also be improved, including a diverging diamond interchange at Wells Branch Parkway. In addition, pedestrian and bicycle paths will be constructed as well as new safety and mobility improvements being carried out.

For more information on companies in this article

Related Content

  • Work underway for Brazil’s Santos-Guarujá Tunnel
    January 12, 2024
    Work is underway for Brazil’s Santos-Guarujá Port Tunnel project.
  • We can be Heroes
    January 11, 2023
    Paraguay’s Puente Héroes del Chaco will provide a vital transport link for the country once it is complete, Mauro Nogarin and Mike Woof report
  • $127 million for Indiana road improvements
    January 30, 2024
    Funding worth US$127 million will help pay for Indiana road improvements.
  • First section of new Texas route opening
    November 21, 2017
    The first stretch of a highway development project in Texas is now open. New southbound toll lanes have been built for the Texas 288 project, running between downtown Houston and the Brazoria County line. The existing southbound traffic is being shifted to these lanes on a temporary basis between Holly Hall and Loop 610. But drivers are not being tolled at present. The US$815 million work is due for completion in 2019, when the tolling system will come into full use. The project involves widening the route