Skip to main content

Texas Interstate connection upgrade project

Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
January 31, 2018 Read time: 2 mins
Consultancy firm Michael Baker International has a US$4 million contract from the 3499 Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.


As part of the larger transportation design/build construction project, Michael Baker will perform Owner Verification Testing and Inspection (OVTI) oversight and conduct audits to verify the design-build team’s Construction Quality Management Plan (CQMP).

“The I-35E and US 67 exchange continues to serve as a highly congested roadway for commuters traveling into the Dallas Metro Area, and the southern gateway corridor project represents a large-scale effort to improve transportation in this highly congested urban area,” said Jorge M Suarez, PE, vice president and director of structural engineering at Michael Baker International. “Michael Baker’s construction management expertise, through inspections, audits and testing, will ensure that the project’s design and construction are completed smartly and safely to help the community and region by reducing congestion and making freeways safer.”

As part of the contract, Michael Baker will perform Owner Verification (OV) tests at a stipulated testing frequency, along with the review and approval of Quality Assurance (QA) test results. The team will review the performance of statistical analysis of OV and QA test results and associated tasks arising out of the statistical analysis with all partnering agencies.

The Southern Gateway Project, which is currently underway, consists of adding reversible non-tolled express lanes and/or general-purpose lanes to improve capacity in the corridor. In addition, bicycle and pedestrian accommodations are proposed where frontage road reconstruction is proposed.

For more information on companies in this article

Related Content

  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Europe's smart road pricing project
    February 20, 2012
    New trials pave the way for smart road pricing using Global Navigation Satellite Systems (GNSS). In recent years, the concept of road charging has been gaining acceptability among Europe's policymakers.
  • Final touches for Seattle’s SR520 floating bridge
    November 21, 2017
    Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane