Skip to main content

Texas Interstate connection upgrade project

Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
January 31, 2018 Read time: 2 mins
Consultancy firm Michael Baker International has a US$4 million contract from the 3499 Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.


As part of the larger transportation design/build construction project, Michael Baker will perform Owner Verification Testing and Inspection (OVTI) oversight and conduct audits to verify the design-build team’s Construction Quality Management Plan (CQMP).

“The I-35E and US 67 exchange continues to serve as a highly congested roadway for commuters traveling into the Dallas Metro Area, and the southern gateway corridor project represents a large-scale effort to improve transportation in this highly congested urban area,” said Jorge M Suarez, PE, vice president and director of structural engineering at Michael Baker International. “Michael Baker’s construction management expertise, through inspections, audits and testing, will ensure that the project’s design and construction are completed smartly and safely to help the community and region by reducing congestion and making freeways safer.”

As part of the contract, Michael Baker will perform Owner Verification (OV) tests at a stipulated testing frequency, along with the review and approval of Quality Assurance (QA) test results. The team will review the performance of statistical analysis of OV and QA test results and associated tasks arising out of the statistical analysis with all partnering agencies.

The Southern Gateway Project, which is currently underway, consists of adding reversible non-tolled express lanes and/or general-purpose lanes to improve capacity in the corridor. In addition, bicycle and pedestrian accommodations are proposed where frontage road reconstruction is proposed.

For more information on companies in this article

Related Content

  • British Columbia selects Road Zipper for Alex Fraser Bridge
    April 4, 2018
    The western Canadian province of British Columbia has signed a deal with Lindsay for deployment of the company’s Road Zipper on the Alex Fraser Bridge The Bridge connects Richmond and New Westminster with North Delta in the Greater Vancouver area. The moveable barrier replaces a static concrete barrier in an attempt to increase traffic flow during peak periods. The Alex Fraser Bridge joins other bridges around the world, such as the Benjamin Franklin Bridge over the Delaware River in the US, that now us
  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Ammann machines helping build infrastructure in Bangladesh
    May 16, 2018
    Soil and asphalt compaction machines from Ammann are working on two key infrastructure projects in Bangladesh. The units are being used by local contractor Spectra Engineers, which is based in Dhaka. The firm has a strong reputation in Bangladesh for quality and is relying on Ammann soil and asphalt compactors for a number of projects. Spectra is one of the leading construction companies in Bangladesh, with considerable expertise and experience building roads and bridges for example. Spectra is working on