Skip to main content

Texas Interstate connection upgrade project

Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
January 31, 2018 Read time: 2 mins
Consultancy firm Michael Baker International has a US$4 million contract from the 3499 Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.


As part of the larger transportation design/build construction project, Michael Baker will perform Owner Verification Testing and Inspection (OVTI) oversight and conduct audits to verify the design-build team’s Construction Quality Management Plan (CQMP).

“The I-35E and US 67 exchange continues to serve as a highly congested roadway for commuters traveling into the Dallas Metro Area, and the southern gateway corridor project represents a large-scale effort to improve transportation in this highly congested urban area,” said Jorge M Suarez, PE, vice president and director of structural engineering at Michael Baker International. “Michael Baker’s construction management expertise, through inspections, audits and testing, will ensure that the project’s design and construction are completed smartly and safely to help the community and region by reducing congestion and making freeways safer.”

As part of the contract, Michael Baker will perform Owner Verification (OV) tests at a stipulated testing frequency, along with the review and approval of Quality Assurance (QA) test results. The team will review the performance of statistical analysis of OV and QA test results and associated tasks arising out of the statistical analysis with all partnering agencies.

The Southern Gateway Project, which is currently underway, consists of adding reversible non-tolled express lanes and/or general-purpose lanes to improve capacity in the corridor. In addition, bicycle and pedestrian accommodations are proposed where frontage road reconstruction is proposed.

For more information on companies in this article

Related Content

  • Lindsay and Iteris partner to create smart work zones on US roads
    April 16, 2019
    Lindsay, a manufacturer of infrastructure equipment, and Iteris, a manufacturer of applied informatics for transportation, will together create smart work zones for US roadways. The companies said that their partnership supports the Federal Highway Administration’s (FHWA) Smarter Work Zone campaign to reduce traffic congestion and improve safety in work zones using intelligent transportation systems. There were 799 workzone-related fatalities in the US in 2017 – up 4.5% from their previous three-year
  • Houston TranStar wins award for travel monitoring
    April 30, 2012
    Houston TranStar has received the "2011 Digital Government Achievement Award" from the Center for Digital Government (government-to-government category). The award is for TranStar's cutting-edge Anonymous Wireless Address Matching travel time information system.
  • Major US interchange project underway
    February 14, 2012
    Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo