Skip to main content

Texas Interstate connection upgrade project

Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
January 31, 2018 Read time: 2 mins
Consultancy firm Michael Baker International has a US$4 million contract from the 3499 Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.


As part of the larger transportation design/build construction project, Michael Baker will perform Owner Verification Testing and Inspection (OVTI) oversight and conduct audits to verify the design-build team’s Construction Quality Management Plan (CQMP).

“The I-35E and US 67 exchange continues to serve as a highly congested roadway for commuters traveling into the Dallas Metro Area, and the southern gateway corridor project represents a large-scale effort to improve transportation in this highly congested urban area,” said Jorge M Suarez, PE, vice president and director of structural engineering at Michael Baker International. “Michael Baker’s construction management expertise, through inspections, audits and testing, will ensure that the project’s design and construction are completed smartly and safely to help the community and region by reducing congestion and making freeways safer.”

As part of the contract, Michael Baker will perform Owner Verification (OV) tests at a stipulated testing frequency, along with the review and approval of Quality Assurance (QA) test results. The team will review the performance of statistical analysis of OV and QA test results and associated tasks arising out of the statistical analysis with all partnering agencies.

The Southern Gateway Project, which is currently underway, consists of adding reversible non-tolled express lanes and/or general-purpose lanes to improve capacity in the corridor. In addition, bicycle and pedestrian accommodations are proposed where frontage road reconstruction is proposed.

For more information on companies in this article

Related Content

  • GRAA Winner Profile: Samuel De Champlain Bridge Corridor project
    June 7, 2023
    The Samuel De Champlain Bridge Corridor in Montreal, Canada is a complex project which includes one of the largest bridge projects in North America, the $4.2 billion signature cable-stayed Samuel De Champlain Bridge, as well as a new Île-des-Soeurs Bridge, reconstruction and widening of the federal portion of Autoroute 15, a 2,044m west approach, and a 762m east approach.
  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl
  • Funding road research in Kenya as infrastructure development grows
    August 14, 2017
    The demand for road construction material research and testing services in Kenya is expected to soar. The East African country is going through a construction boom, despite policy and financial challenges facing public institutions overseeing the research and testing operations in the transport industry. “Kenya is going through a construction boom and so is the demand for construction material testing services,” said Juma Ali Madzitsa, Geotechnical Lab Supervisor at SGS Kenya, a subsidiary of Swiss based in
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v