Skip to main content

Texas highway contract

Michael Baker International has been awarded a US$6.1 million contract by the Texas Department of Transportation (TxDOT). The contract is for Construction Engineering and Inspection (CEI) services for the Lowest Stemmons Freeway project. The Lowest Stemmons project, a 3.7km stretch of Interstate-35E (I-35E), runs from Interstate-30 to north of Oak Lawn Avenue in Dallas. The aim of the project is to reduce congestion, improve mobility and deliver more reliable travel times. The project is also the first for
January 22, 2018 Read time: 2 mins
Michael Baker International has been awarded a US$6.1 million contract by the 3499 Texas Department of Transportation (TxDOT). The contract is for Construction Engineering and Inspection (CEI) services for the Lowest Stemmons Freeway project. The Lowest Stemmons project, a 3.7km stretch of Interstate-35E (I-35E), runs from Interstate-30 to north of Oak Lawn Avenue in Dallas. The aim of the project is to reduce congestion, improve mobility and deliver more reliable travel times. The project is also the first for the TxDOT Dallas District under the Texas Clear Lanes congestion relief initiative.


Unprecedented population growth in Texas has resulted in increased traffic congestion. The Lowest Stemmons Freeway/I-35E is listed as the eighth most congested roadway segment in Texas and one of TxDOT’s top priorities in the Dallas metro area. The project will provide operational improvement along I-35E with the construction of collector-distributor roads and reconstruction of frontage roads from I-30 to North of Oak Lawn Avenue, six new bridges, two bridge widenings, and 17 retaining walls. Within this section of I-35E, the project will improve connectivity by reducing multiple weaves and relieving congestion. TxDOT estimates the improvements could help increase peak travel time speeds. The project commenced in August 2017 with estimated completion in early 2020.

During the construction phase of the project, Michael Baker will ensure the public’s safety as they travel through this high-profile highway system. The inspection team will oversee implementation of traffic control systems to facilitate safe driving by maintaining clear and properly staged signage and traffic control devices.

For more information on companies in this article

Related Content

  • North Carolina highway contract awarded
    August 16, 2019
    A contract for a 12km highway upgrade project has been awarded to a joint venture by the NC Department of Transportation (NCDOT). Fluor says it will book the US$263 million contract in the third quarter of 2019. The project will widen I-26 from two lanes to four lanes in each direc
  • What happens when you run out of land for roads?
    November 1, 2021
    Mumbai, the financial capital of India has a population of 12.4 million located in a small area of 437sq.km, surrounded by the sea with nowhere to expand. An increase in congestion on Mumbai’s roads has put a strain on the city’s infrastructure. The result has been long commute times with idling cars contributing to an alarming rise in poor air quality, impacting the quality of life for residents
  • Tackling congestion on Arkansas link
    June 14, 2017
    Engineering firm Michael Baker International has helped deliver highway improvements for a key link in Arkansas. The upgrade to Highway 70 involves widening and is designed to boost capacity along a 30km stretch of the route.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi