Skip to main content

Tennessee highway bridge explosive demolition VIDEO

Explosive demolition has been used to remove a Tennessee bridge that no longer met requirements. The bridge was on Tennessee Interstate 65 near Franklin in Williamson County and has been removed by a specialist contractor. The highway authorities decided to demolish the bridge following a crash involving a tanker truck in August of this year. The structure was pre-drilled with explosive charges and then demolished remotely, with the explosive demolition being carried out successfully and without any injurie
September 23, 2014 Read time: 1 min
Explosive demolition has been used to remove a Tennessee bridge that no longer met requirements. The bridge was on Tennessee Interstate 65 near Franklin in Williamson County and has been removed by a specialist contractor. The highway authorities decided to demolish the bridge following a crash involving a tanker truck in August of this year. The structure was pre-drilled with explosive charges and then demolished remotely, with the explosive demolition being carried out successfully and without any injuries.

Related Content

  • J-Tech’s LaneBlade clears the way
    February 28, 2022
    The hydraulically operated LaneBlade is mounted on the front of service vehicles meaning rescue personnel are safe from dangerously venturing onto live lanes or having to ‘look-and-leap’ for gaps in traffic.
  • VIDEO: Gap closed for Gordie Howe Bridge
    July 26, 2024
    A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
  • Preparations are underway for a new bridge in Venezuela
    June 25, 2013
    A large bridge project is being planned in Venezuela, with ground investigation leading the way In Venezuela, preparation work is now being carried out for a major new bridge project. The European geotechnical specialist Lankelma is supplying its Combifloat C5 jack-up platform, JUP Sandpiper, to begin work on the ground investigation for the new Puente Nigale (in English: Nigale Bridge) over Lake Maracaibo in Venezuela. The Nigale Bridge will be the second crossing over Venezuela’s largest lake. The link,
  • Compact demolition tool from Brokk
    December 2, 2014
    The upgraded electric Brokk 400 demolition tool now benefits from a larger undercarriage for heavy-tracking applications. This remote-controlled demolition machine also has a new hydraulic system, with more efficient fluid flow when the machine is operating a drill attachment. The new 400 model machine features a bigger drive axis, rollers and sidetracks. The new tracks are 10% longer than before, improving wear life for machines used in applications that require a lot of tracking and provides up to 60% gre