Skip to main content

Tennessee highway bridge explosive demolition VIDEO

Explosive demolition has been used to remove a Tennessee bridge that no longer met requirements. The bridge was on Tennessee Interstate 65 near Franklin in Williamson County and has been removed by a specialist contractor. The highway authorities decided to demolish the bridge following a crash involving a tanker truck in August of this year. The structure was pre-drilled with explosive charges and then demolished remotely, with the explosive demolition being carried out successfully and without any injurie
September 23, 2014 Read time: 1 min
Explosive demolition has been used to remove a Tennessee bridge that no longer met requirements. The bridge was on Tennessee Interstate 65 near Franklin in Williamson County and has been removed by a specialist contractor. The highway authorities decided to demolish the bridge following a crash involving a tanker truck in August of this year. The structure was pre-drilled with explosive charges and then demolished remotely, with the explosive demolition being carried out successfully and without any injuries.

Related Content

  • AEM proposes highway funding solutions
    February 15, 2012
    The Association of Equipment Manufacturers (AEM) is offering a novel solution to funding sources for the US Highway Bill.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.