Skip to main content

Tenders placed for Polish expressway project

Bidding has been strong for an expressway project in Poland. The S7 route will connect Olsztynek and Milomyn with the Ostroda ring road. The project is expected to cost in the region of €350.64 million to construct in all. Seven bidders competed for the project with a consortium comprising contractors Intercor, Erbedim and Pozbud making the highest offer at €416.42 million. The lowest offer meanwhile came from another construction consortium comprising the companies Salini, Todini and Impregilo with a bid o
July 22, 2014 Read time: 1 min

Bidding has been strong for an expressway project in Poland. The S7 route will connect Olsztynek and Milomyn with the Ostroda ring road. The project is expected to cost in the region of €350.64 million to construct in all. Seven bidders competed for the project with a consortium comprising contractors Intercor, Erbedim and Pozbud making the highest offer at €416.42 million. The lowest offer meanwhile came from another construction consortium comprising the companies Salini, 5482 Todini and 3149 Impregilo with a bid of €240.8 million.

For more information on companies in this article

Related Content

  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra
  • FIEC aims to tackle lowest possible cost bidding
    February 28, 2012
    The FIEC, the European construction industry federation, aims to end unfair competition by state-owned and state-aided enterprises across the globe.
  • Poland bidders angry over Astaldi win for Warsaw Ring Road work
    June 18, 2015
    Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi