Skip to main content

The tender process for a key highway project in Nepal is opening

Tendering is opening for the consultation work for Nepal’s major Kathmandu-Terai/Madesh Expressway project. World Highways correspondent for Nepal, Ram Krishna Wagle, reports that the route will be designed to meet the Asian Highway Primary Class A standard. The work will review the previously completed detail engineering survey, detail design of expressway, the design of the expressway retaining structures, cross-drainage structures and drainage structures. It will also review river training structures, hi
October 15, 2019 Read time: 1 min
Improving Nepal’s key routes will help develop the country’s economy

Tendering is opening for the consultation work for Nepal’s major Kathmandu-Terai/Madesh Expressway project. World Highways correspondent for Nepal, Ram Krishna Wagle, reports that the route will be designed to meet the Asian Highway Primary Class A standard. The work will review the previously completed detail engineering survey, detail design of expressway, the design of the expressway retaining structures, cross-drainage structures and drainage structures. It will also review river training structures, highway pavement structures, underpasses and overpasses, toll plazas, interchanges, rest areas, road furniture, cut slope design and landslides protection. A key focus of the design review will be for the alignment and tunnel sections. The project is being managed by the Nepalese Army and Nepalese Government. Improving key road routes in Nepal will help boost economic development as well as safety for road users, increasing capacity and reducing journey times.

Related Content

  • Nepal’s road network continues to develop
    October 15, 2012
    Data from the Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was
  • Work commencing on key Nepal tunnel connection
    November 15, 2013
    Work is starting in Nepal on a new tunnel project worth some US$347 million. The new tunnel forms part of the 58km route between Hetauda and Kathmandu. The project developer is Nepal Purbadhar Bikas (NPBCL) and the tunnel is being built at Bhimphedi in Makwanpur. The new route will reduce the journey time between Hetauda and Kathmandu from six hours at present to just one hour when the tunnel opens to traffic in December 2016. Once the new route is open it is also expected to improve traffic safety as the e
  • Kewatkhali Bridge construction to start
    October 11, 2023
    The project in Bangladesh for the steel arch bridge includes a 6.2km four-lane approach road.
  • Nepal's traffic improvements on track
    April 26, 2012
    Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas.