Skip to main content

Tender evaluation nears for Croatia’s Peljeski Bridge Project

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
September 22, 2017 Read time: 2 mins

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media.

Bids for construction of the four-lane 2.4km long bridge have been submitted by the 3366 China Road and Bridge Corporation, Austria's 945 Strabag as well as consortia headed by Italy’s 1324 Astaldi and the Turkish company Ictas.

The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory.

While the bridge will be good for the economy of the Croatian area, Bosnia and Herzegovina has in the past requested that Croatia pause procurement for the project pending discussions between the two countries over the design.

Bosnia’s concern is that the largest ocean-going ships should have access up Ston Bay to Bosnia’s only sea port, Neum, should the Bosnian government decide to upgrade the terminals there.

Discussions have resulted in Croatia accepting design changes – and added costs - suggested by Bosnia, including an increase of bridge's height from 35m to 55m and spacing bridge supports at least 200m apart.

In June, the 2465 European Commission approved €357 million of the European Union’s Cohesion Policy funds to build the bridge – around 85% of the project’s cost. The European Union is also funding supporting infrastructure, such as the construction of access roads, including tunnels, bridges and viaducts, the building of an 8km-long bypass near the town of Ston and upgrading works on the existing road D414. Project completion is set for 20122.

Croatia's prime minister, Andrej Plenkovic, has consistently said that the project will not jeopardise the interests of Bosnia.

For more information on companies in this article

Related Content

  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Despite earlier contractor issues, road projects in Bosnia are proceeding on track
    May 16, 2012
    Key road construction projects are now moving forward in Bosnia with work on-track for the Sarajevo ringroad as well as the Corridor Vc highway. Construction of a 130km section of the Corridor Vc highway should be complete by 2014 according to Bosnia's Ministry of Transport and Telecoms. Work on the first section of the Sarajevo ringroad should be completed within five months, following the signing of an agreement worth €17 million between the Austrian firm Strabag and the Bosnian company HP Investing. The
  • Ring road for Sarajevo nears completion
    December 17, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag. The completed Ring Road will be part of the future Corridor Vc motorway. Bosnia and Herzegovina Federal Minister of Transport and Telecoms, Enver Bijedic, and State Minister of Telecoms and Transport and Director of the roads company JP Ceste FBiH, Filip Vujevo, r