Skip to main content

Tender evaluation nears for Croatia’s Peljeski Bridge Project

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
September 22, 2017 Read time: 2 mins

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media.

Bids for construction of the four-lane 2.4km long bridge have been submitted by the 3366 China Road and Bridge Corporation, Austria's 945 Strabag as well as consortia headed by Italy’s 1324 Astaldi and the Turkish company Ictas.

The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory.

While the bridge will be good for the economy of the Croatian area, Bosnia and Herzegovina has in the past requested that Croatia pause procurement for the project pending discussions between the two countries over the design.

Bosnia’s concern is that the largest ocean-going ships should have access up Ston Bay to Bosnia’s only sea port, Neum, should the Bosnian government decide to upgrade the terminals there.

Discussions have resulted in Croatia accepting design changes – and added costs - suggested by Bosnia, including an increase of bridge's height from 35m to 55m and spacing bridge supports at least 200m apart.

In June, the 2465 European Commission approved €357 million of the European Union’s Cohesion Policy funds to build the bridge – around 85% of the project’s cost. The European Union is also funding supporting infrastructure, such as the construction of access roads, including tunnels, bridges and viaducts, the building of an 8km-long bypass near the town of Ston and upgrading works on the existing road D414. Project completion is set for 20122.

Croatia's prime minister, Andrej Plenkovic, has consistently said that the project will not jeopardise the interests of Bosnia.

For more information on companies in this article

Related Content

  • Mumbai sea link contract
    September 6, 2018
    The contract has been awarded for the Mumbai sea link project in India. The Versova-Bandra Sea Link Project is expected to cost US$987.6 million to build and is should take five years to construct. When complete the 17.7km bridge will be the longest sea crossing in India. The project will be handled by a consortium made up of Astaldi and Reliance Infrastructure under an engineering, procurement and construction package. The deal was awarded by the Maharashtra State Road Development Corporation.
  • Polaqua signs S6 dual carriageway deal and Tri-City contract
    April 9, 2018
    Polish contractor Polaqua has signed a deal worth €193 million to design and build a 20km section of S6 dual carriageway. Completion is scheduled for mid-2021. Polaqua will also build a 3km section as part of the expansion of the ring road around the Tri-City area in northern Poland. Tri-City incorporates the three cities in Pomerania - Gdańsk, Gdynia and Sopot, as well as surrounding minor towns. They are situated along the coast of Gdańsk Bay on the Baltic Sea. The regional population is more than 1
  • New highway connection between Montenegro and Bosnia
    September 23, 2014
    New highway links between Montenegro and Bosnia will make major improvements in transport links for the two countries. Bosnia Herzogovina plans to build its 110km stretch of the Adriatic-Ionic highway that will connect with Montenegro. Meanwhile in Montenegro, plans are in hand for the first stretch of the Bar-Boljare highway. The Bosnian Government is finalising the route for the Adriatic-Ionic highway, based on an earlier feasibility study. This route is of prime importance for the region as it will conne
  • Strabag and GBS-Infrastructure to build Sofia-Kalotina motorway
    August 2, 2018
    Austrian construction firm Strabag and Bulgarian firm GBS-Infrastructure Construction have won the contract to build the 32.4 km Sofia-Kalotina motorway. Cost of the 32.4kmn four-lane project is estimated at €120 million with completion set for 2020. The Kalotina motorway will run from the capital Sofia’s ring road to the border town of Kalotina where it will connect with Serbia’s A4 motorway. It is also part of 6,100km 10-country European route E80 running from the Portuguese capital Lisbon to the