Skip to main content

Tender evaluation nears for Croatia’s Peljeski Bridge Project

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
September 22, 2017 Read time: 2 mins

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media.

Bids for construction of the four-lane 2.4km long bridge have been submitted by the 3366 China Road and Bridge Corporation, Austria's 945 Strabag as well as consortia headed by Italy’s 1324 Astaldi and the Turkish company Ictas.

The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory.

While the bridge will be good for the economy of the Croatian area, Bosnia and Herzegovina has in the past requested that Croatia pause procurement for the project pending discussions between the two countries over the design.

Bosnia’s concern is that the largest ocean-going ships should have access up Ston Bay to Bosnia’s only sea port, Neum, should the Bosnian government decide to upgrade the terminals there.

Discussions have resulted in Croatia accepting design changes – and added costs - suggested by Bosnia, including an increase of bridge's height from 35m to 55m and spacing bridge supports at least 200m apart.

In June, the 2465 European Commission approved €357 million of the European Union’s Cohesion Policy funds to build the bridge – around 85% of the project’s cost. The European Union is also funding supporting infrastructure, such as the construction of access roads, including tunnels, bridges and viaducts, the building of an 8km-long bypass near the town of Ston and upgrading works on the existing road D414. Project completion is set for 20122.

Croatia's prime minister, Andrej Plenkovic, has consistently said that the project will not jeopardise the interests of Bosnia.

For more information on companies in this article

Related Content

  • Strabag in Hungary M6 deal
    November 10, 2020
    The southernmost Bóly-Ivándárda section is the last M6 section to be built.
  • Interest is strong in a highway project in Bosnia
    May 4, 2012
    Interest is strong in a major road contract in the autonomous Republika Srpska region of Bosnia. So far three Croatian companies, Ingra Inzinjering, Viadukt and Konstruktor have submitted bids for construction of the new highway that is planned and which will be 37km long. The European Bank for Reconstruction and Development approved a finance package worth some €150 million to fund construction of the highway. Bosnian roads company Autoputevi Republike Srpske has said that out of 31 companies which purchas
  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev