Skip to main content

Tender evaluation nears for Croatia’s Peljeski Bridge Project

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
September 22, 2017 Read time: 2 mins

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media.

Bids for construction of the four-lane 2.4km long bridge have been submitted by the 3366 China Road and Bridge Corporation, Austria's 945 Strabag as well as consortia headed by Italy’s 1324 Astaldi and the Turkish company Ictas.

The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory.

While the bridge will be good for the economy of the Croatian area, Bosnia and Herzegovina has in the past requested that Croatia pause procurement for the project pending discussions between the two countries over the design.

Bosnia’s concern is that the largest ocean-going ships should have access up Ston Bay to Bosnia’s only sea port, Neum, should the Bosnian government decide to upgrade the terminals there.

Discussions have resulted in Croatia accepting design changes – and added costs - suggested by Bosnia, including an increase of bridge's height from 35m to 55m and spacing bridge supports at least 200m apart.

In June, the 2465 European Commission approved €357 million of the European Union’s Cohesion Policy funds to build the bridge – around 85% of the project’s cost. The European Union is also funding supporting infrastructure, such as the construction of access roads, including tunnels, bridges and viaducts, the building of an 8km-long bypass near the town of Ston and upgrading works on the existing road D414. Project completion is set for 20122.

Croatia's prime minister, Andrej Plenkovic, has consistently said that the project will not jeopardise the interests of Bosnia.

For more information on companies in this article

Related Content

  • Croatia’s Peljesac Bridge progressing
    June 11, 2020
    China Road and Bridge Corporation is working through the pandemic period.
  • Croatia: Peljeski Bridge decision in summer 2017
    November 21, 2016
    Croatia’s minister of infrastructure, Oleg Butkovic, said a winner will be chosen to build the controversial Peljeski Bridge on the Adriatic Sea coast by summer 2017. The project, valued at around €370 million, will be carried out in three phases. In June, a tender was started by the national roads company Hrvatske Ceste but was halted last month over complaints by some bidders about pre-qualification issues. The State Commission for Control of Public Ordering recently rejected the pre-qualificatio
  • Polish projects to get Cohesion Fund cash
    March 6, 2018
    Almost €790 million will be allocated from the Cohesion Fund for three road projects which improve the country's communication with Germany and other Western and Eastern European countries. Around €270 million will be for the Garwolin-to-Kurow S17 dual carriageway, another €125 million to build a stretch of the S6 dual carriageway between Goleniow and Kielp and €390 million for the S2 on the outskirts of Warsaw.
  • Croatia’s Pelješac Bridge to open mid-year
    February 8, 2022
    China’s CRBC started construction on the bridge in 2019 amid concerns by European construction companies of price dumping.