Skip to main content

Tees Valley crossing project consultation nears an end

Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
May 9, 2019 Read time: 2 mins
Artist’s impression of the New Tees Crossing Tees Viaduct Capacity Enhancement option

Public consultation is nearly closed for a possible %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external new crossing across the River Tees false https://teesvalley-ca.gov.uk/transport/new-tees-crossing-consultation/ false false%> in northern England that could cost upwards of €350 million.

A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government.

Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound and the existing structure widened to allow for an extra lane of southbound traffic.

The Tees Viaduct option would be to construct a four-lane bridge parallel to the existing A19 viaduct to handle both north and southbound traffic.

The chosen option will be announced in autumn with confirmation of central government funding soon after. Construction is set for 2023-27.

The Tees Valley Combined Authority was created in April 2016, combining Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. In 2017, residents elected a mayor whose responsibilities include transport, business growth and investment.

The existing 2.9km-long viaduct, opened in 1975, is a girder bridge with reinforced concrete piers and pier bends supporting steel-plate girder beams and a composite deck with around 200 moving parts. Distance between the abutments is 1.95km and none of the piers are in the river. It has 68 spans on the main north south route, with the largest span, 117m, being over the river.

In 1989 work finished on enclosing the underside of the bridge with steel and glass-reinforced plastic panelling to protect the primary structure from weathering and to allow safer and more easy maintenance.

Related Content

  • New conference plans for European road directors
    October 30, 2013
    Plans are in hand for the Conference of European Directors of Roads (CEDR). This event is now run every four years, with this next CEDR conference being the third to be held. The governing board for CEDR held a meeting in Helsinki and the Road Directors’ association reviewed the final report on the implementation of its previous strategic plan and the formalisation of its next. The CEDR strategic plan 3 (SP3) is to develop the priorities and targets for its next cycle. Each SP determines the structuring an
  • Hidromek is developing wheeled loaders
    January 6, 2017
    Hidromek is commencing work on developing its new wheeled loader line. Export manager Anil Bingöl said, “We have started our wheeled loader project and we hope to have our first prototype machine this year.” This will feature a 3m3 bucket and will be the first in a range of wheeled loaders from the firm. Machines with bucket capacities of 4m3 and then 5m3 will be developed in due course. Testing of the first prototype will be carried out in Turkey and Bingöl said the firm intends to have its wheeled loaders
  • Hidromek’s showcases HMK140LC crawler excavator
    January 6, 2017
    Now producing 10,000 backhoe loaders and crawler and wheeled excavators a year and looking to expand its product range later this year, Hidromek has also been adding new features to its existing machines including the HMK140LC crawler excavator. Featuring a re-designed cabin and new ‘Opera’ control system, the 140LC comes with a four-cylinder Mitsubishi engine, a 4.6m boom and a 0.6m³ cubic bucket capacity. The machine has an operating weight of 14,300kg.
  • Hidromek’s showcases HMK140LC crawler excavator
    April 12, 2012
    Now producing 10,000 backhoe loaders and crawler and wheeled excavators a year and looking to expand its product range later this year, Hidromek has also been adding new features to its existing machines including the HMK140LC crawler excavator. Featuring a re-designed cabin and new ‘Opera’ control system, the 140LC comes with a four-cylinder Mitsubishi engine, a 4.6m boom and a 0.6m³ cubic bucket capacity. The machine has an operating weight of 14,300kg.