Skip to main content

Tees Valley crossing project consultation nears an end

Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
May 9, 2019 Read time: 2 mins
Artist’s impression of the New Tees Crossing Tees Viaduct Capacity Enhancement option

Public consultation is nearly closed for a possible %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external new crossing across the River Tees false https://teesvalley-ca.gov.uk/transport/new-tees-crossing-consultation/ false false%> in northern England that could cost upwards of €350 million.

A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government.

Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound and the existing structure widened to allow for an extra lane of southbound traffic.

The Tees Viaduct option would be to construct a four-lane bridge parallel to the existing A19 viaduct to handle both north and southbound traffic.

The chosen option will be announced in autumn with confirmation of central government funding soon after. Construction is set for 2023-27.

The Tees Valley Combined Authority was created in April 2016, combining Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. In 2017, residents elected a mayor whose responsibilities include transport, business growth and investment.

The existing 2.9km-long viaduct, opened in 1975, is a girder bridge with reinforced concrete piers and pier bends supporting steel-plate girder beams and a composite deck with around 200 moving parts. Distance between the abutments is 1.95km and none of the piers are in the river. It has 68 spans on the main north south route, with the largest span, 117m, being over the river.

In 1989 work finished on enclosing the underside of the bridge with steel and glass-reinforced plastic panelling to protect the primary structure from weathering and to allow safer and more easy maintenance.

Related Content

  • Bonfiglioli opts for AC/DC electric drum drive for truck mixers
    April 18, 2013
    Bonfiglioli has developed an electric drum drive for the new hybrid truck mixer from CIFA, the concrete equipment specialist owned by Chinese manufacturer Zoomlion. The 500 series drum drive with electric motor offers drum rotation speeds from 15-22rpm and is suited to mixer capacities from 6-14m3. The drivetrain relies on an AC induction motor to turn the drum, which gets its power from an on-board battery pack. The electric drum drive can also be powered by mains electricity – the latter can be plugged in
  • France tops Eurobitume’s European bitumen consumption table
    November 20, 2017
    Among European countries, France consumed the most bitumen in 2016, using over 2.2 million tonnes of the black stuff, according to figures from Eurobitume. The recent 2016 Eurobitume Bitumen Consumption Statistics for Europe shows that bitumen consumption across all grades for Europe as a whole was 11,274 million tonnes in 2016.
  • Fraccaroli & Balzan targets large quarries with its new filter press
    January 6, 2017
    Fraccaroli & Balzan, which designs, manufactures and installs waste water treatment systems, is showcasing its biggest filter press yet at bauma 2013. Previously the Italian firm only made lateral beam-type filter presses, which can only go up to a certain size and capacity. Now Fraccaroli & Balzan has developed high beam filter presses, which can be much larger and designed for quarries that need to process high volumes of material. “This filter press is for big quarries with big production that prefer to
  • Fraccaroli & Balzan targets large quarries with its new filter press
    April 19, 2013
    Fraccaroli & Balzan, which designs, manufactures and installs waste water treatment systems, is showcasing its biggest filter press yet at bauma 2013. Previously the Italian firm only made lateral beam-type filter presses, which can only go up to a certain size and capacity. Now Fraccaroli & Balzan has developed high beam filter presses, which can be much larger and designed for quarries that need to process high volumes of material. “This filter press is for big quarries with big production that prefer to