Skip to main content

Tees Valley crossing project consultation nears an end

Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
May 9, 2019 Read time: 2 mins
Artist’s impression of the New Tees Crossing Tees Viaduct Capacity Enhancement option

Public consultation is nearly closed for a possible %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external new crossing across the River Tees false https://teesvalley-ca.gov.uk/transport/new-tees-crossing-consultation/ false false%> in northern England that could cost upwards of €350 million.

A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government.

Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound and the existing structure widened to allow for an extra lane of southbound traffic.

The Tees Viaduct option would be to construct a four-lane bridge parallel to the existing A19 viaduct to handle both north and southbound traffic.

The chosen option will be announced in autumn with confirmation of central government funding soon after. Construction is set for 2023-27.

The Tees Valley Combined Authority was created in April 2016, combining Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. In 2017, residents elected a mayor whose responsibilities include transport, business growth and investment.

The existing 2.9km-long viaduct, opened in 1975, is a girder bridge with reinforced concrete piers and pier bends supporting steel-plate girder beams and a composite deck with around 200 moving parts. Distance between the abutments is 1.95km and none of the piers are in the river. It has 68 spans on the main north south route, with the largest span, 117m, being over the river.

In 1989 work finished on enclosing the underside of the bridge with steel and glass-reinforced plastic panelling to protect the primary structure from weathering and to allow safer and more easy maintenance.

Related Content

  • Superior Industries seeks to meet new dealers at bauma 2013
    January 28, 2013
    Superior Industries, which claims to be North America’s only combination manufacturer of conveyor systems and their related accessories, has said it plans to pursue new international dealer candidates at bauma 2013. It is asking dealers interested in distributing its brand of conveying equipment and/or conveyor components to complete a pre-show questionnaire at superior-ind.com/bauma.
  • Doosan unveils high strength and productive 50tonne class excavators
    February 7, 2013
    Doosan says its two new large Stage IIIB compliant crawler excavators in the 50tonne class offer the strength and productivity needed for heavy duty work such as large-scale earthmoving, moving rock, and secondary breaking projects found on quarrying and mining, highway, aggregate, demolition, and other construction projects. The 49 tonne DX490LC-3 and 52 tonne DX530LC-3 are said to have excellent fuel efficiency, while representing an excellent return on investment for civil engineering companies, major co
  • Hidromek adds long-reach excavators
    January 6, 2017
    Hidromek has added long-reach options for three of its excavators – the HMK220LC, HMK300LC and the HMK370LC. Aimed at special earthmoving and drainage applications, the excavators carry LR branding and have ground level reach of 15.06, 18.19 and 16.6m respectively. Load over heights range from 10.85m with the HMK220LC LR to 12.59 with the HMK300LC LR. The long-reach HMK220LC delivers 7,300kgf of bucket digging force with a 0.45m3 bucket, with the figures rising to 1m3 and 11,400kgf with the HMK370LC LR.
  • Hidromek adds long-reach excavators
    April 15, 2013
    Hidromek has added long-reach options for three of its excavators – the HMK220LC, HMK300LC and the HMK370LC. Aimed at special earthmoving and drainage applications, the excavators carry LR branding and have ground level reach of 15.06, 18.19 and 16.6m respectively. Load over heights range from 10.85m with the HMK220LC LR to 12.59 with the HMK300LC LR. The long-reach HMK220LC delivers 7,300kgf of bucket digging force with a 0.45m3 bucket, with the figures rising to 1m3 and 11,400kgf with the HMK370LC LR.