Skip to main content

Tees Valley crossing project consultation nears an end

Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
May 9, 2019 Read time: 2 mins
Artist’s impression of the New Tees Crossing Tees Viaduct Capacity Enhancement option

Public consultation is nearly closed for a possible %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external new crossing across the River Tees false https://teesvalley-ca.gov.uk/transport/new-tees-crossing-consultation/ false false%> in northern England that could cost upwards of €350 million.

A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government.

Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound and the existing structure widened to allow for an extra lane of southbound traffic.

The Tees Viaduct option would be to construct a four-lane bridge parallel to the existing A19 viaduct to handle both north and southbound traffic.

The chosen option will be announced in autumn with confirmation of central government funding soon after. Construction is set for 2023-27.

The Tees Valley Combined Authority was created in April 2016, combining Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. In 2017, residents elected a mayor whose responsibilities include transport, business growth and investment.

The existing 2.9km-long viaduct, opened in 1975, is a girder bridge with reinforced concrete piers and pier bends supporting steel-plate girder beams and a composite deck with around 200 moving parts. Distance between the abutments is 1.95km and none of the piers are in the river. It has 68 spans on the main north south route, with the largest span, 117m, being over the river.

In 1989 work finished on enclosing the underside of the bridge with steel and glass-reinforced plastic panelling to protect the primary structure from weathering and to allow safer and more easy maintenance.

Related Content

  • PERI unveils VARIOKIT heavy-duty truss girder
    January 6, 2017
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • PERI unveils VARIOKIT heavy-duty truss girder
    April 18, 2013
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • A free bridge? You’ve got to be kidding.
    February 18, 2015
    Nothing will stop construction of another bridge crossing the Detroit River to ease traffic congestion around North America’s most important economic border. The New International Trade Crossing will be entirely financed and owned by the Canadian government under a public private partnership. It will link the US city of Detroit, in the state of Michigan, with the Canadian city of Windsor in the province of Ontario. The two cities already have the toll road Ambassador Bridge as well as a toll road tunnel and