Skip to main content

TBMs for Australian project named

To massive TBNMs for a road project in Melbourne, Australia have been named. The TBMs weigh 4,000tonnes each and will be called Vida and Bella, in honour of suffragette and social reformer Vida Goldstein, and the first woman to graduate from an Australian university, Bella Guerin. The machines will start work shortly on the West Gate Tunnel project. The new tunnel link will provide an alternative for drivers to the West Gate Bridge and will help reduce congestion and travel times for drivers.
October 25, 2018 Read time: 1 min

To massive TBNMs for a road project in Melbourne, Australia have been named. The TBMs weigh 4,000tonnes each and will be called Vida and Bella, in honour of suffragette and social reformer Vida Goldstein, and the first woman to graduate from an Australian university, Bella Guerin. The machines will start work shortly on the West Gate Tunnel project. The new tunnel link will provide an alternative for drivers to the West Gate Bridge and will help reduce congestion and travel times for drivers.

Related Content

  • Norway moves toward more E39 coastal road improvements
    April 4, 2019
    Norway is working on plans to make more of the major north-south E39 coastal route a ferry-free highway, coasting €35.3 billion, according to media. In Norway, the trans-European route 39 is part national road system and is developed and maintained by the public roads administration. It runs for 1,330km along the coast from Klett just south of Trondheim to Nørresundby. Norway’s E39 is mostly a two-lane undivided road with only relatively short sections near Stavanger, Trondheim and Bergen being motorw
  • Meeting the IRF Fellows and hearing of their positive experiences
    April 23, 2019
    Morgan Morris, a master’s student at the University of Central Florida, recounts her life-changing experience as President of the 2019 Class of IRF Fellows After the short span of a week, a graduate research IRF Fellow transforms into an approachable, professional leader overflowing with inspiration and ideas. “In some ways, attending the IRF Fellows Road Scholar Program is comparable to going to an all-you-can-eat sushi buffet. You are not sure what exactly you signed up for, but in the end, you rea
  • Wheeled loaders working hard in tough conditions
    April 16, 2018
    Wheeled loaders from XCMG are working hard in two extremely tough applications, in Russia and Mongolia Both of these extraction operations require the equipment to work long hours and often in extremes of climate. In the Xilin Gol League of Inner Mongolia, the XCMG wheeled loaders are working at a surface extraction operation. The site has been extremely productive, achieving a production capacity of over 22 million tonnes in the 10 years since it started. The operation has always opted to use XCMG loa
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.