Skip to main content

Tasmanian bridge proposal faces controversy

The design proposal for a new Tasmanian bridge project faces controversy.
By MJ Woof October 27, 2020 Read time: 2 mins
The proposed replacement for Hobart’s Bridgewater Bridge faces controversy – image courtesy of © Andrianocz, Dreamstime.com
The design put forward for the Bridgewater Bridge replacement project in Tasmania, Australia is facing controversy. The new bridge is required as the existing steel truss design, completed in 1946, has suffered maintenance issues ever since it opened to traffic.

The new bridge is expected to cost in the region of US$402 million (A$570 million), which will make it the biggest single transport project ever carried out in Tasmania. However, the design that has been unveiled has been criticised for being too costly. Some locals are also calling for the existing bridge and its rail link to be retained rather than being demolished, as it is a listed historic structure.

The existing lifting bridge carries both road and rail connections and has to be replaced as its maximum height poses limitations on the size of vessels that can pass underneath. It also places size and weight restrictions on vehicles and is proving unable to cope with the growing traffic volumes passing over it as the population in and around Hobert expands, while its maintenance issues have themselves become costly. Cables installed for the lifting mechanism in 1994 had to be replaced considerably sooner than expected. Although the bridge only rarely opens now, it has proved troublesome on the comparatively few occasions it has been raised.

The new bridge is needed as the link forms a critical part of the transport and freight link between the northern and southern regions of Tasmania. Increasing traffic volumes result in congestion at peak periods, increasing journey times and causing delays for commuters and trucks.

The proposed design is for a 1.6km-long box girder bridge that provides a clearance of just over 16m above the River Derwent. This will carry two lanes of traffic in either direction as well as having provision for cyclists and pedestrians.  The bridge will provide a new crossing between the Brooker Highway and Midland Highway, including connections to the Lyell Highway and it will allow for vehicle speeds of up to 80km/h.

Construction is intended to commence in 2022 with completion aimed for by 2024. A substantial portion of the funding required is being provided by the Australian Government due to the importance of the project for Tasmania.

Related Content

  • Alabama bridge project being proposed again
    December 29, 2021
    Proposals have been made for a new Alabama bridge project.
  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
  • Parsons wins bridge deal in Arkansas
    January 17, 2017
    Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap