Skip to main content

Tasmanian bridge proposal faces controversy

The design proposal for a new Tasmanian bridge project faces controversy.
By MJ Woof October 27, 2020 Read time: 2 mins
The proposed replacement for Hobart’s Bridgewater Bridge faces controversy – image courtesy of © Andrianocz, Dreamstime.com
The design put forward for the Bridgewater Bridge replacement project in Tasmania, Australia is facing controversy. The new bridge is required as the existing steel truss design, completed in 1946, has suffered maintenance issues ever since it opened to traffic.

The new bridge is expected to cost in the region of US$402 million (A$570 million), which will make it the biggest single transport project ever carried out in Tasmania. However, the design that has been unveiled has been criticised for being too costly. Some locals are also calling for the existing bridge and its rail link to be retained rather than being demolished, as it is a listed historic structure.

The existing lifting bridge carries both road and rail connections and has to be replaced as its maximum height poses limitations on the size of vessels that can pass underneath. It also places size and weight restrictions on vehicles and is proving unable to cope with the growing traffic volumes passing over it as the population in and around Hobert expands, while its maintenance issues have themselves become costly. Cables installed for the lifting mechanism in 1994 had to be replaced considerably sooner than expected. Although the bridge only rarely opens now, it has proved troublesome on the comparatively few occasions it has been raised.

The new bridge is needed as the link forms a critical part of the transport and freight link between the northern and southern regions of Tasmania. Increasing traffic volumes result in congestion at peak periods, increasing journey times and causing delays for commuters and trucks.

The proposed design is for a 1.6km-long box girder bridge that provides a clearance of just over 16m above the River Derwent. This will carry two lanes of traffic in either direction as well as having provision for cyclists and pedestrians.  The bridge will provide a new crossing between the Brooker Highway and Midland Highway, including connections to the Lyell Highway and it will allow for vehicle speeds of up to 80km/h.

Construction is intended to commence in 2022 with completion aimed for by 2024. A substantial portion of the funding required is being provided by the Australian Government due to the importance of the project for Tasmania.

Related Content

  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor
  • Work underway on key Romanian projects
    March 28, 2022
    Work is well underway on key Romanian road and bridge projects.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.