Skip to main content

Targeted road loan for Uzbekistan

A targeted road loan will pay for a route upgrade in Uzbekistan.
By MJ Woof July 8, 2020 Read time: 1 min
The AIIB is providing a loan to improve road stretches in Uzbekistan’s Bukhara Region - image courtesy of © Desuz, Dreamstime.com

A loan from the Asian Infrastructure Investment Bank (AIIB) will pay for work to upgrade the A380 route in Uzbekistan. The loan is worth US$165.5 million.

The funding will pay for improvements to a 78km stretch of the A380 running through Uzbekistan’s Bukhara Region. In addition, a number of stretches of the M37 highway in the Bukhara Region will also be improved. This route provides an important international link for Uzbekistan, so the route plays a key role in trade, transport and economic activity for the country.

Roads in Uzbekistan’s Xoraazm Region as well as in the autonomous Republic of Karakalpakstan, which borders with Kazakhstan and Turkmenistan, are also to benefit from improvements that will be paid for by the AIIB loan.

Related Content

  • Road safety collaboration
    July 9, 2025
    A road safety collaboration will cut road crash casualties in Asia.
  • US$1.44 billion funding for Nigerian infrastructure
    June 6, 2024
    US$1.44 billion funding is being secured for Nigerian transport infrastructure works.
  • Texas route benefits from loan
    March 1, 2012
    Drivers in Texas using the SH161 route are set to benefit from a US$418 million loan being provided by the US Department of Transportation to complete work on the link.
  • World Bank loan for Bolivia roads
    November 16, 2015
    A loan from the World Bank (WB) will help fund repair work to a key road link in Bolivia. The US$225 million loan will be used to improve roads in Bolivia, with the most important project being for the repair and upgrade of the link connecting Trinidad with Santa Cruz. The funds will help pay for improvements to a 567km stretch of this road, which will be resurfaced and improved. The work is expected to cost around $215 million to complete