Skip to main content

Taiwan’s new tunnel safety technology

Moxa has equipped Taiwan’s Hsuehshan Tunnel with its NPort 5230 device servers and EDS-508A-SS-SC Ethernet switches as part of the tunnel emergency traffic control system. The tunnel is south east Asia's second longest road tunnel and comprises three independent tunnels (one pilot tunnel, one West-bound tunnel, and one east-bound tunnel) stretching 12.9 kilometers through Hsuehshan Mountain, the second highest mountain in East Asia.
August 30, 2012 Read time: 1 min
6489 Moxa has equipped Taiwan’s Hsuehshan Tunnel with its NPort 5230 device servers and EDS-508A-SS-SC Ethernet switches as part of the tunnel emergency traffic control system.

The tunnel is south east Asia's second longest road tunnel and comprises three independent tunnels (one pilot tunnel, one West-bound tunnel, and one east-bound tunnel) stretching 12.9 kilometers through Hsuehshan Mountain, the second highest mountain in East Asia.  Emergencies occurring inside tunnels of this length can be disastrous, especially a fire-related incident. To minimise casualties during an emergency, a traffic control system consisting of two entry gates and two exit gates is deployed to lower the appropriate gates in the event of an emergency to effectively divert traffic and prevent vehicle entry into dangerous areas.

Moxa's NPort 5230 device servers connect RS-232/422/485 serial devices for remote control/monitoring, while the EDS-508A-SS-SC Ethernet switches feature Turbo Ring and Turbo Chain technologies for recovery times of less than 20 ms at 250-switch load.

For more information on companies in this article

Related Content

  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Efficient aggregate production technology
    July 13, 2020
    Efficient aggregate production technology is now coming to market, offering lower cost/tonne production
  • Advances in wheeled loaders coming to market
    February 14, 2022
    Manufacturers are introducing new wheeled loaders that offer performance advantages over earlier generation machines
  • British Tunnelling Society conference: digging deep for data
    December 13, 2016
    Tunnelling innovation is creating mountains of data for contractors and designers, delegates to a recent British Tunnelling Society (BTS) conference heard Successful innovation in tunnelling techniques and technologies is creating more and more data, thanks to digitalisation.