Skip to main content

Taiwan’s new tunnel safety technology

Moxa has equipped Taiwan’s Hsuehshan Tunnel with its NPort 5230 device servers and EDS-508A-SS-SC Ethernet switches as part of the tunnel emergency traffic control system. The tunnel is south east Asia's second longest road tunnel and comprises three independent tunnels (one pilot tunnel, one West-bound tunnel, and one east-bound tunnel) stretching 12.9 kilometers through Hsuehshan Mountain, the second highest mountain in East Asia.
August 30, 2012 Read time: 1 min
6489 Moxa has equipped Taiwan’s Hsuehshan Tunnel with its NPort 5230 device servers and EDS-508A-SS-SC Ethernet switches as part of the tunnel emergency traffic control system.

The tunnel is south east Asia's second longest road tunnel and comprises three independent tunnels (one pilot tunnel, one West-bound tunnel, and one east-bound tunnel) stretching 12.9 kilometers through Hsuehshan Mountain, the second highest mountain in East Asia.  Emergencies occurring inside tunnels of this length can be disastrous, especially a fire-related incident. To minimise casualties during an emergency, a traffic control system consisting of two entry gates and two exit gates is deployed to lower the appropriate gates in the event of an emergency to effectively divert traffic and prevent vehicle entry into dangerous areas.

Moxa's NPort 5230 device servers connect RS-232/422/485 serial devices for remote control/monitoring, while the EDS-508A-SS-SC Ethernet switches feature Turbo Ring and Turbo Chain technologies for recovery times of less than 20 ms at 250-switch load.

For more information on companies in this article

Related Content

  • Building the Pfänder tunnes
    February 10, 2012
    The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling. Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by PERI.
  • Building the Pfänder tunnes
    April 11, 2012
    The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling. Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by PERI.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Safer highway containment continues to grow
    March 8, 2012
    A steady flow of new technology and systems is ensuring the highway barrier sector is seeing major gains in safety. Mike Woof reports A combination of technological development and tougher regulations are ensuring a constant flow of new safety barrier solutions for the highway sector. Issues such as containment and deflection are high on the technical agenda, while a wide array of technologies is being developed to meet specific needs for certain applications. Both in the US and Europe, an increased focus o