Skip to main content

Taiwan’s new tunnel safety technology

Moxa has equipped Taiwan’s Hsuehshan Tunnel with its NPort 5230 device servers and EDS-508A-SS-SC Ethernet switches as part of the tunnel emergency traffic control system. The tunnel is south east Asia's second longest road tunnel and comprises three independent tunnels (one pilot tunnel, one West-bound tunnel, and one east-bound tunnel) stretching 12.9 kilometers through Hsuehshan Mountain, the second highest mountain in East Asia.
August 30, 2012 Read time: 1 min
6489 Moxa has equipped Taiwan’s Hsuehshan Tunnel with its NPort 5230 device servers and EDS-508A-SS-SC Ethernet switches as part of the tunnel emergency traffic control system.

The tunnel is south east Asia's second longest road tunnel and comprises three independent tunnels (one pilot tunnel, one West-bound tunnel, and one east-bound tunnel) stretching 12.9 kilometers through Hsuehshan Mountain, the second highest mountain in East Asia.  Emergencies occurring inside tunnels of this length can be disastrous, especially a fire-related incident. To minimise casualties during an emergency, a traffic control system consisting of two entry gates and two exit gates is deployed to lower the appropriate gates in the event of an emergency to effectively divert traffic and prevent vehicle entry into dangerous areas.

Moxa's NPort 5230 device servers connect RS-232/422/485 serial devices for remote control/monitoring, while the EDS-508A-SS-SC Ethernet switches feature Turbo Ring and Turbo Chain technologies for recovery times of less than 20 ms at 250-switch load.

For more information on companies in this article

Related Content

  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • Cultivate better on-site safety awareness by leveraging technology with Leica Geosystems
    August 10, 2023
    When a vital fiber-optic cable was cut during construction work in Germany, the impact was huge. There were telecom disruptions affecting the greater Frankfurt area, all departures and landings at Frankfurt Airport were suspended, and Lufthansa’s global IT system crashed. Leica Geosystems says it is vital to put in place “strategies to protect people, equipment, and assets… and to emphasise the crucial role digital solutions play in ensuring safety.”
  • Latest loader innovations
    January 21, 2025
    A range of loader innovations is coming to the wheeled loader segment – Mike Woof writes
  • Tunnel breakthrough for new Auckland link in New Zealand
    October 8, 2014
    Auckland’s Western Ring Route project update - Mary Bell writes. A number of integrated projects in Auckland, New Zealand, will improve the lot of road users and cyclists, and significantly alter the topography of the city’s motorway. On September 29th the tunnel boring machine digging the first of twin road tunnels beneath the city broke into daylight after 10 months underground. The new 2.4km-long Waterview tunnels will connect the city’s Northwestern and Southwestern motorways, each carrying three lane