Skip to main content

Taiwan bridge project awarded

UK firm Zaha Hadid Architects' has won the contract to design the Tamkang Bridge in Taiwan. The award was announced by Taiwan’s Directorate-General of Highways (DGH). The winning design is an asymmetrical cable-stayed bridge supported by a single pylon. The winner was chosen by a committee of 15 members, with designs sent in by US-based, Denmark-based, Germany-based, South Korea-based, Japan-based and Taiwan-based architecture companies. The Tamkang Bridge, which is 900m in length, will be built based on Za
August 17, 2015 Read time: 1 min
UK firm 4122 Zaha Hadid Architects' has won the contract to design the Tamkang Bridge in Taiwan. The award was announced by Taiwan’s Directorate-General of Highways (DGH). The winning design is an asymmetrical cable-stayed bridge supported by a single pylon. The winner was chosen by a committee of 15 members, with designs sent in by US-based, Denmark-based, Germany-based, South Korea-based, Japan-based and Taiwan-based architecture companies. The Tamkang Bridge, which is 900m in length, will be built based on Zaha Hadid Architects' design submitted by Germany-based Leonhardt, Andra und Partner and Taiwan-based Sinotech Engineering Consultants. By 2020, the bridge, which links Bali and Tamsui Districts, is expected to be ready for use. The structure will feature a bike lane, a pedestrian pathway, four traffic lanes and a reserved lane for a light-rail system.

For more information on companies in this article

Related Content

  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • New Wear Crossing cables fully installed and tensioned to 50%
    September 21, 2017
    Structural engineering company VSL International has installed all 28 cable stays of England’s New Wear Crossing and stressed them to 50% of their design load. The next stage of stressing the cables will happen next month and be to 100% of design load. This will allow the construction team to adjust and tension them just enough to lift the bridge deck off the blue steel temporary supports that were constructed in the river to take the weight of the structure.
  • IRF announces the winners of its 2019 Global Road Achievement Awards
    February 13, 2020
    IRF has announced the winners of the 2019 IRF Global Road Achievement Awards, a global competition to recognise outstanding achievement by road professionals.
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin