Skip to main content

Taiwan bridge project awarded

UK firm Zaha Hadid Architects' has won the contract to design the Tamkang Bridge in Taiwan. The award was announced by Taiwan’s Directorate-General of Highways (DGH). The winning design is an asymmetrical cable-stayed bridge supported by a single pylon. The winner was chosen by a committee of 15 members, with designs sent in by US-based, Denmark-based, Germany-based, South Korea-based, Japan-based and Taiwan-based architecture companies. The Tamkang Bridge, which is 900m in length, will be built based on Za
August 17, 2015 Read time: 1 min
UK firm 4122 Zaha Hadid Architects' has won the contract to design the Tamkang Bridge in Taiwan. The award was announced by Taiwan’s Directorate-General of Highways (DGH). The winning design is an asymmetrical cable-stayed bridge supported by a single pylon. The winner was chosen by a committee of 15 members, with designs sent in by US-based, Denmark-based, Germany-based, South Korea-based, Japan-based and Taiwan-based architecture companies. The Tamkang Bridge, which is 900m in length, will be built based on Zaha Hadid Architects' design submitted by Germany-based Leonhardt, Andra und Partner and Taiwan-based Sinotech Engineering Consultants. By 2020, the bridge, which links Bali and Tamsui Districts, is expected to be ready for use. The structure will feature a bike lane, a pedestrian pathway, four traffic lanes and a reserved lane for a light-rail system.

For more information on companies in this article

Related Content

  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.