Skip to main content

Systra, Kiewit and Hatch to build third bridge in Kingston, Canada

Kingston, Canada, has selected Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project. Seven international teams answered the requests for proposals in February and 2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups. The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect
August 31, 2018 Read time: 1 min
Kingston in the Canadian province of Ontario: the city’s Third Crossing Bridge will be the first in North America to use an integrated project delivery model
Kingston, Canada, has selected 5549 Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project.


Seven international teams answered the requests for proposals in February and  2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups.

The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect John Counter Boulevard in the west to Gore Road in the east.

According to the consortium and Kingston, the integrated project design is similar to a design-build except that Kingston and the contracted design and construction partners will work within the US$140 million budget, sharing risk and reward.

The project is being jointly funded by the government of Canada, the province of Ontario and the Kingston – each financing a third of the cost.

Site preparation work will start this month and construction is expected to start in December 2019.

A name for the unofficially called Third Crossing will be chosen through public consultation later on. Meanwhile, more information about the Third Crossing Bridge is available on the city of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Kingston's website false https://thirdcrossing.cityofkingston.ca/ false false%>.

Kingston’s other major crossing is the La Salle Causeway that carries Highway 2 over the Cataraqui River that separates Kingston's inner and outer harbours. Three bridges are incorporated into the causeway that was opened in 1917. The centre one is a trunnion bascule lift bridge designed by Joseph Strauss, designer of the Golden Gate Bridge in San Francisco. Around 23,000 vehicles cross the causeway daily.

The La Salle Causeway replaced the wooden Penny Bridge System that included three bridges: two at each end of the causeway and in the centre a bascule bridge. Of these, only the original centre lift bridge remains. A concrete bridge replaced the steel bridges at the east in 1962 and in the west end of the causeway in 1993.

For more information on companies in this article

Related Content

  • PPRA Niagara Falls: getting better value for road maintenance budgets
    August 19, 2015
    Larger road budgets would go a long way towards maintaining in top shape highway infrastructure across the United States and Canada. But even considering what is being spent now, are road owners and highway contractors getting the biggest bang for their buck? That’s what delegates to this year’s Pavement Preservation Recycling Alliance conference in the beautiful Canadian resort city of Niagara Falls will find out from October 13-15. “One of the things that I learned in Paris at the first Pavement Preser
  • Plan worth sticking too
    April 8, 2013
    Plan supplies turn-key plants for the manufacture of precast concrete elements for civil, industrial and commercial buildings. The company’s machinery and plants are designed and built with innovative and useful solutions to produce wall panels, columns, beams, roof elements, hollow-core slabs. Plan can also provide special bespoke products on request. The firm’s services also include installation and commissioning, factory design, electrical and mechanical design, operator training, and after-sales service
  • New top-of-the-range wheeled loader from Doosan
    January 31, 2013
    The new generation DL550 wheeled loader from Doosan Infracore is the top-of-the-range model in the company’s updated range of wheel loaders intended for markets in the Middle East and Africa. With a bucket capacity of 5.4m3, the DL550 wheel loader is powered by a 12.7 litre Scania DC13 turbo-charged, air-to-air intercooled diesel engine that meets Tier 2 legislation and suits use in the Middle East and Africa. The engine delivers 294kW at 2100rpm and drives through a new ZF transmission. Other features com
  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B