Skip to main content

Sydney faces highway delays?

Concerns are being expressed in Australia that upgrades to the road system in Sydney will be delayed. The improvements to the F3 and M4 East to M2 extension are now likely to start in 2026 and the M2 to M4 East tunnel project are expected to commence in 2036.
May 29, 2012 Read time: 1 min
Concerns are being expressed in Australia that upgrades to the road system in Sydney will be delayed. The improvements to the F3 and M4 East to M2 extension are now likely to start in 2026 and the M2 to M4 East tunnel project are expected to commence in 2036. The M4 East project will require at least 16 years to complete. A shortage of funds has been revealed as the major problem.

Related Content

  • MB’s versatile crusher buckets entering Chinese market
    November 21, 2018

    MB crusher is now offering its high performance crusher buckets into the Chinese market, as well as the rest of South East Asia. The firm is introducing two models for excavators, the BF120.4 model to China, which is suitable for excavators in the 30tonne class and above, as well as the BF90.3, which is suited for excavators weighing from 21tonnes and above. In addition, MB Crusher is now offering the MB-L200 crusher bucket, which is designed for use with wheeled loaders, backhoe loaders and skid steer loaders.

  • Performance probe for National Highways
    February 21, 2024
    A report published last July concerning England's National Highways agency noted several risk areas where problems could arise and which have now done so, according to UK media reports.
  • Czech road project, bidding delay
    May 22, 2023
    Bidding has been delayed for a major Czech road project.
  • New highway infrastructure planned for Nepal
    March 18, 2014
    Interest is said to be strong for a key highway project in Nepal. The project to build the US$1.02 billion Kathmandu-Tarai Fast Track route has attracted interest from China in the shape of the China Infrastructure Investment Corporation (CIIC) and from India with Reliance Infrastructure, and Shapoorji Pallonji. The 76km highway will commence at Khokana and connect capital Kathmandu with Nijgadh. Should CIIC win the deal it has said it will source funding from China’s Exim Bank. The project has been hit by