Skip to main content

Swiss tunnel options

Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes o
June 19, 2012 Read time: 2 mins
Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes of seasonal tourist traffic. A third option is to build a new tunnel and then close the existing link for the necessary work. Once the work would be finished, both tunnels would be used with traffic travelling in a single direction. This last option is likely to be the most costly, some €1.66 billion (CHF 2 billion) in all. There is support for the various options in the cantons affected and the Swiss Government will review the details and make its decision shortly.

Related Content

  • Mont Blanc Tunnel maintenance closure
    April 26, 2024
    The Mont Blanc Tunnel will be closed for maintenance.
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Onsite asphalt recycling
    December 15, 2020
    Equipment from Ammann has played a key role in renovating a section of the N2 highway in Switzerland