Skip to main content

Swiss tunnel options

Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes o
June 19, 2012 Read time: 2 mins
Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes of seasonal tourist traffic. A third option is to build a new tunnel and then close the existing link for the necessary work. Once the work would be finished, both tunnels would be used with traffic travelling in a single direction. This last option is likely to be the most costly, some €1.66 billion (CHF 2 billion) in all. There is support for the various options in the cantons affected and the Swiss Government will review the details and make its decision shortly.

Related Content

  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a
  • Widening works: road user’s nightmare or operator’s challenge?
    March 14, 2017
    Early - and continuous planning - is essential for successful road widening projects. By Nina Sacagiu, project manager, and Laurent Charles-Nicolas, project director, at Egis. Keeping goods and people moving safely is the primary objective of any transport authority across the world. Delivering this objective on motorways and making the most out of network capacity requires all the resources, skills and ingenuity of those in charge of managing the infrastructure. When the network can no longer cope wit