Skip to main content

Swiss tunnel options

Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes o
June 19, 2012 Read time: 2 mins
Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes of seasonal tourist traffic. A third option is to build a new tunnel and then close the existing link for the necessary work. Once the work would be finished, both tunnels would be used with traffic travelling in a single direction. This last option is likely to be the most costly, some €1.66 billion (CHF 2 billion) in all. There is support for the various options in the cantons affected and the Swiss Government will review the details and make its decision shortly.

Related Content

  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • Yunex tunnel management in Israel
    November 29, 2022
    The new Route 16 opens another gateway to Jerusalem and connects Highway 1 with the western and southern neighbourhoods
  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.