Skip to main content

Sweden proposing building electric road

A new electric road is being proposed for Sweden. The stretch of road would feature advanced charging technology. Two locations are being considered, a 4km stretch linking Östercentrum and Visby Airport on Gotland and a 1.4km section close to Almedalan. The section of road would feature the latest inductive charging system, so that EVs would be able to recharge wirelessly. The project is being managed by the Transport Administration (Trafikverket), with the participation of the electrified road consortium,
October 12, 2018 Read time: 1 min
A new electric road is being proposed for Sweden. The stretch of road would feature advanced charging technology. Two locations are being considered, a 4km stretch linking Östercentrum and Visby Airport on Gotland and a 1.4km section close to Almedalan. The section of road would feature the latest inductive charging system, so that EVs would be able to recharge wirelessly. The project is being managed by the Transport Administration (1096 Trafikverket), with the participation of the electrified road consortium, ElectRoad.


The cost of the project has not so far been revealed. The electrified road link is intended as a step towards greater EV use in Sweden, with the goal of reducing the role played by vehicles powered by internal combustion engines in transport sector in the future.

For more information on companies in this article

Related Content

  • Embedded sensors help deliver self-monitoring roads
    November 22, 2021
    As road authorities look to automate their road monitoring and maintenance, we will need more and more sensors within our highway networks
  • A fresh breath of air
    July 16, 2012
    With a new wave of exhaust emission regulations coming shortly, engine manufacturers are well on track to develop new solutions as Mike Woof reports A wave of technological advances has made the current generation of diesels the cleanest industrial engines ever produced. Driven by tightening controls on emissions, manufacturers have had to develop an array of innovative solutions that will help cut particulate and NOx being emitted from the tailpipe. When the phased reduction in exhaust emissions was first
  • City centre tunnel and traffic management project
    February 21, 2012
    Norra Länken (Northern Link), a 16km highway and tunnel system in the centre of the Swedish capital Stockholm, is one of the country’s largest highway and infrastructure projects.
  • Japan is planning lanes for AVs
    September 25, 2023
    Japan is planning on setting up special lanes for use by AVs.