Skip to main content

Sweden and Denmark consider link between Helsingør and Helsingborg

Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail. The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg. Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.
July 2, 2018 Read time: 2 mins
A Helsingør to Helsingborg bridge could take traffic off the Øresund bridge (pictured) that opened in 2000
Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail.


The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg.

Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.

The completion in 2000 of the Øresund Bridge to the south, linking Copenhagen and Malmö, lessened the importance of Helsingør and Helsingborg ferry link but they ships still operate almost non-stop on this short route. The vessels carry man foot-passengers looking for days out in the two cities. For many drivers the ferry crossing saves driving distance compared to using The Øresund toll bridge.

Helsingør, known in English as Elsinore, has a population of around 62,000 and lies 45kkm from the capital Copenhagen. The city’s Kronborg castle is believed to have been the template for the setting of Hamlet by William Shakespeare.

Helsingborg, with a population of around 140,00, lies 555km to the south of the Swedish capital Stockholm.

The Øresund – a road and rail structure - runs along an 8km cable-stayed bridge to an artificial island where it then enters a 4km-long tunnel. It features two 204m-high pylons supporting the 490m-long bridge span across the Flinte Channel. The motorway runs on the upper level while the railway runs underneath.

Most bridge structures including the piers and spans were built on land and towed into position on barges. Only the pylons were cast in situ. The Øresund is operated by both countries and was designed by Danish engineering firm 2349 COWI along with main architect George KS Rotne.

For more information on companies in this article

Related Content

  • Itinera wins Sweden’s Skurusunds Bridge near Stockholm
    January 21, 2019
    Italian contractor Itinera will build the new 99m-long and 31m-wide Skurusunds Bridge near Stockholm in Sweden. Trafikverket, the Swedish transport administration, awarded the €75 million contract to Itinera, part of Gruppo Gavio. The new bridge will be parallel to the existing bridge which will remain. It handles around 52,000 vehicles daily, many of them commuting to and from Stockholm. Work will include improvements to traffic junctions at Skuru and Björknäs. The four-lane steel bridge will have
  • Bumpy road for Australian drivers
    June 27, 2018
    It’s a bumpy road for speeders around Curtin University in Perth, western Australia. The university has installed two Actibump systems along a road that traverses the campus. Each day around around 2,000 vehicles use the street which has a speed limit of 40kph. However, about 70% of the vehicles on the road are speeding, according to Graham Arndt, director of operations and maintenance at Curtin University. The Actibump affects only drivers who are above the speed limit, a limit which is set using the sys
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • New German bridge links
    July 9, 2012
    Two border crossing bridges are being planned to link Germany with other European nations, Denmark and Luxembourg. The Danish engineering consultancy company Cowi has the contract to design a 19km bridge across the Fehmarn Belt between Denmark and Germany. Planning is expected to take three years and the project will entail major engineering challenges.