Skip to main content

Sweden and Denmark consider link between Helsingør and Helsingborg

Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail. The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg. Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.
July 2, 2018 Read time: 2 mins
A Helsingør to Helsingborg bridge could take traffic off the Øresund bridge (pictured) that opened in 2000
Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail.


The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg.

Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.

The completion in 2000 of the Øresund Bridge to the south, linking Copenhagen and Malmö, lessened the importance of Helsingør and Helsingborg ferry link but they ships still operate almost non-stop on this short route. The vessels carry man foot-passengers looking for days out in the two cities. For many drivers the ferry crossing saves driving distance compared to using The Øresund toll bridge.

Helsingør, known in English as Elsinore, has a population of around 62,000 and lies 45kkm from the capital Copenhagen. The city’s Kronborg castle is believed to have been the template for the setting of Hamlet by William Shakespeare.

Helsingborg, with a population of around 140,00, lies 555km to the south of the Swedish capital Stockholm.

The Øresund – a road and rail structure - runs along an 8km cable-stayed bridge to an artificial island where it then enters a 4km-long tunnel. It features two 204m-high pylons supporting the 490m-long bridge span across the Flinte Channel. The motorway runs on the upper level while the railway runs underneath.

Most bridge structures including the piers and spans were built on land and towed into position on barges. Only the pylons were cast in situ. The Øresund is operated by both countries and was designed by Danish engineering firm 2349 COWI along with main architect George KS Rotne.

For more information on companies in this article

Related Content

  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v