Skip to main content

Sweden and Denmark consider link between Helsingør and Helsingborg

Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail. The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg. Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.
July 2, 2018 Read time: 2 mins
A Helsingør to Helsingborg bridge could take traffic off the Øresund bridge (pictured) that opened in 2000
Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail.


The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg.

Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.

The completion in 2000 of the Øresund Bridge to the south, linking Copenhagen and Malmö, lessened the importance of Helsingør and Helsingborg ferry link but they ships still operate almost non-stop on this short route. The vessels carry man foot-passengers looking for days out in the two cities. For many drivers the ferry crossing saves driving distance compared to using The Øresund toll bridge.

Helsingør, known in English as Elsinore, has a population of around 62,000 and lies 45kkm from the capital Copenhagen. The city’s Kronborg castle is believed to have been the template for the setting of Hamlet by William Shakespeare.

Helsingborg, with a population of around 140,00, lies 555km to the south of the Swedish capital Stockholm.

The Øresund – a road and rail structure - runs along an 8km cable-stayed bridge to an artificial island where it then enters a 4km-long tunnel. It features two 204m-high pylons supporting the 490m-long bridge span across the Flinte Channel. The motorway runs on the upper level while the railway runs underneath.

Most bridge structures including the piers and spans were built on land and towed into position on barges. Only the pylons were cast in situ. The Øresund is operated by both countries and was designed by Danish engineering firm 2349 COWI along with main architect George KS Rotne.

For more information on companies in this article

Related Content

  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.

  • AFRY to supply SCADA for Nordhavn deal
    September 23, 2022
    The project entails construction of a 1.4km tunnel across Svanemølle Bay and the construction of a replacement harbour in the Danish capital Copenhagen.
  • Lithuania plans road network revamp
    June 4, 2019
    A new plan by the Lithuanian Road Administration (LAKD) has been set out in a bid to revamp the nation’s roads. The plan will run until 2035 and includes rebuilding 400km of the country’s worst roads as a priority and unsurfaced roads will benefit from asphalt surfaces in a plan worth €1 billion. The Via Baltica route running from the Latvian border to the Polish border will be rebuilt in eight stages and is expected to cost €684 million. Improvements will also be carried out connecting capital Vilnius with
  • New Angolan bridge offers improved connectivity
    September 30, 2013
    Drivers in Angola are benefiting from a bridge that spans the Catumbela River, taking the place of an old structure that had proven not fit for purpose. The US$35 million cable stayed bridge is located in the highway between Benguela and Lobito, around 7km from Angola’s Atlantic coast and is one of a series of new infrastructure developments in the country. Angola suffered a long period of war that impacted on its people and infrastructure. The war resulted in severe damage to the country’s road system alon