Skip to main content

Sweden and Denmark consider link between Helsingør and Helsingborg

Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail. The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg. Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.
July 2, 2018 Read time: 2 mins
A Helsingør to Helsingborg bridge could take traffic off the Øresund bridge (pictured) that opened in 2000
Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail.


The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg.

Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.

The completion in 2000 of the Øresund Bridge to the south, linking Copenhagen and Malmö, lessened the importance of Helsingør and Helsingborg ferry link but they ships still operate almost non-stop on this short route. The vessels carry man foot-passengers looking for days out in the two cities. For many drivers the ferry crossing saves driving distance compared to using The Øresund toll bridge.

Helsingør, known in English as Elsinore, has a population of around 62,000 and lies 45kkm from the capital Copenhagen. The city’s Kronborg castle is believed to have been the template for the setting of Hamlet by William Shakespeare.

Helsingborg, with a population of around 140,00, lies 555km to the south of the Swedish capital Stockholm.

The Øresund – a road and rail structure - runs along an 8km cable-stayed bridge to an artificial island where it then enters a 4km-long tunnel. It features two 204m-high pylons supporting the 490m-long bridge span across the Flinte Channel. The motorway runs on the upper level while the railway runs underneath.

Most bridge structures including the piers and spans were built on land and towed into position on barges. Only the pylons were cast in situ. The Øresund is operated by both countries and was designed by Danish engineering firm 2349 COWI along with main architect George KS Rotne.

For more information on companies in this article

Related Content

  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • Fehmarn Fixed Link project finally gets European Commission approval
    March 31, 2020
    EC settles the public financing issue for the Fehmarn project that includes an immersed tunnel.
  • Norway mega-project contract for Fugro
    December 20, 2017
    The largest road project in Norway’s history has seen Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.