Skip to main content

Sweco lands lead consultancy on Scotland’s Cross Tay Link project

Engineering, environment and design consultancy Sweco UK has won the contract as the lead consultant on the Cross Tay Link Road project near Perth, Scotland. Sweco UK was appointed by Perth & Kinross Council under a €3.86 million contract as parat of the on the project whose value is around €124.5 million. Phase two of four of the Perth Transport Futures Project includes the realignment of a section of the A9 trunk road and provision of a bridge across the River Tay – the third across the river - and over t
August 17, 2017 Read time: 2 mins
Artist impression of the planned Cross Tay Link bridge, the third bridge across the River Tay
Engineering, environment and design consultancy 3392 Sweco UK has won the contract as the lead consultant on the Cross Tay Link Road project near Perth, Scotland.

Sweco UK was appointed by Perth & Kinross Council under a €3.86 million contract as parat of the on the project whose value is around €124.5 million. 
 
Phase two of four of the Perth Transport Futures Project includes the realignment of a section of the A9 trunk road and provision of a bridge across the River Tay – the third across the river - and over the railway line. There will be a new grade-separated junction on the A9 and a new 6km road connecting the A9 with the A93 and A94 roads.
 
 
Sweco said that its Glasgow and Edinburgh offices will deliver the project with support from the consultancy’s expertise across the UK. Works include infrastructure design, site investigations, drainage and flood assessments, public utility liaison and design, as well as environmental impact, archaeological and ecological studies.
 
The consultancy will support Perth & Kinross Council through the planning application and tendering and procurement process, and will remain involved in a project management and site supervision role until its conclusion, said Chris Cardno, Sweco UK operations manager.

Design of the Cross Tay Link Road is due to be completed in mid-2019, with a planning application submitted later that year. If approved, construction should start in 2021 with completion in 2023.

For more information on companies in this article

Related Content

  • Italy's new southern highway route
    May 13, 2021
    An important new highway route is currently under construction in South Italy
  • Stonehenge tunnel project being designed
    April 12, 2017
    Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T
  • Going Digital helped the Government of Malaysia leverage digital twins to deliver trusted information for better project and asset management.
    March 30, 2020
    In 2014, the government of Malaysia announced a plan to fully develop and upgrade the two-lane trunk road across Malaysia’s largest state, Sarawak, to accelerate socioeconomic growth in East Malaysia.
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.