Skip to main content

Successful overnight bridge demolition

In the UK a contractor carried out a successful overnight demolition of a highway bridge. Demolition firm S Evans and Sons carried out the work, as a sub-contract to main contractor Balfour Beatty. The work involved removing the pedestrian bridge located close to the town of Stafford. The bridge spanned the busy M54 motorway and the work was carried out at night to minimise disturbance to the traffic flow.
March 10, 2014 Read time: 1 min
In the UK a contractor carried out a successful overnight demolition of a highway bridge. Demolition firm S Evans and Sons carried out the work, as a sub-contract to main contractor 1146 Balfour Beatty. The work involved removing the pedestrian bridge located close to the town of Stafford. The bridge spanned the busy M54 motorway and the work was carried out at night to minimise disturbance to the traffic flow.

For more information on companies in this article

Related Content

  • Bridge demolition easier with modern machines
    February 23, 2012
    The speedy and safe removal of old or unwanted structures is made easier with modern, sophisticated equipment, Patrick Smith reports. The power and versatility of modern demolition tools and machines was demonstrated when a bridge was removed overnight as part of a motorway widening project.
  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.
  • FCC and ACS of Spain to take part in tender for UK’s Mersey bridge project
    May 22, 2013
    Spanish construction companies FCC and ACS say they will take part in the tender of the US$3.05 billion (£2bn) Mersey bridge project in the UK. FCC and ACS will take part as members of two of the three consortia that have expressed an interest. FCC will take part in the tender through its German subsidiary Hochtief, and it infrastructures division Iridium, within the consortium led by BAM Nuttal of the UK. Meanwhile, ACS will be part of the Bilfinger and Macquarie consortium through its subsidiary Globalvia
  • Durable chevrons to boost site vehicle conspicuity and safety
    January 31, 2017
    Contractor Colas has worked with Farnborough Signs to develop safer temporary chevrons for use on vehicles accessing construction sites. Colas identified a potential safety risk with removable magnetic Chapter 8 Chevrons used for vehicles visiting worksites. Operational site vehicles have to be fitted with permanent Chapter 8 Chevron markings. However, the change in car manufacturing specifications in recent years has resulted in many car boots being made of plastic instead. Earlier generation magnetic