Skip to main content

Successful Nebraska bridge explosive demolition

The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.
February 24, 2014 Read time: 1 min
The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.

Related Content

  • VIDEO: Saskatoon bridge demolition removes final span
    November 18, 2016
    The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.
  • Damaged Norwegian bridge undergoes successful demolition
    February 23, 2015
    A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
  • Successful overnight bridge demolition
    March 10, 2014
    In the UK a contractor carried out a successful overnight demolition of a highway bridge. Demolition firm S Evans and Sons carried out the work, as a sub-contract to main contractor Balfour Beatty. The work involved removing the pedestrian bridge located close to the town of Stafford. The bridge spanned the busy M54 motorway and the work was carried out at night to minimise disturbance to the traffic flow.
  • Czech bridge facing demolition over condition concerns
    October 29, 2018
    A bridge located in Prague, capital of the Czech Republic, is facing calls for its demolition. Concern has been expressed over the condition of the Hlavka Bridge, which spans the Vltava River. The bridge carries heavy vehicle traffic as well as trams and is one of the city’s major transport arteries. It was built originally from 1909 to 1912, replacing an earlier wooden structure. It was then rebuilt so as to cope with vehicle traffic and at present carries up to 100,000 vehicles/day, making it one of the b