Skip to main content

Successful Nebraska bridge explosive demolition

The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.
February 24, 2014 Read time: 1 min
The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • New methods for non-destructive concrete testing
    August 29, 2017
    How best is it possible to assess the state of concrete in a road pavement, bridge deck or tunnel wall? One of the most reliable ways is to take a core of concrete from the structure to analyse and test in the laboratory. One downside to this method is that doing the test creates weak points in the structure that must then be repaired. Another is that the frequency of such cores cannot be too great – so it is possible that some problem areas will be missed. New technologies from the world of geospatial eng
  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • Contracts for $1.9 billion Francis Scott Key bridge
    February 27, 2025
    Key contracts have been awarded for the $1.9 billion Francis Scott Key bridge.