Skip to main content

Successful Nebraska bridge explosive demolition

The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.
February 24, 2014 Read time: 1 min
The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Bechtel achieves tricky bridge replacement in tight timeframe
    March 21, 2012
    Contractor Bechtel has worked with Network Rail to complete a major road bridge upgrade in the UK. A construction team worked 104 hours consecutively to replace the bridge, located at Reading Station.
  • Collapsed Italian bridge to be replaced
    September 5, 2018
    Plans are being drawn up for a new structure to replace the Morandi Bridge in Italy, which collapsed recently with disastrous results. The Italian road firm Autostrade per l'Italia (ASPI) has a draft design that features eight supports, unlike the failed Morandi Bridge, which was designed with 11 supports. The new bridge design also includes a deck that features emergency lanes, which were not included on the old Morandi Bridge.
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.