Skip to main content

Successful Nebraska bridge explosive demolition

The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.
February 24, 2014 Read time: 1 min
The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.

Related Content

  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Demolition starts for Gerald Desmond Bridge
    July 14, 2022
    The 125m-long span will be dismantled, cut and lowered onto a barge in the waters around the Port of Long Beach in the US state of California.
  • Nebraska plows ahead with an MDSS from Parsons and Iteris
    November 7, 2017
    Parsons will provide a maintenance decision support system (MDSS) and automatic vehicle location system on 650 snowplows in the US state of Nebraska. Under the five-year contract, Parsons will use MDSS informatics technology developed by Iteris. The system uses data from remote weather information stations, as well as temperature data from Parsons-equipped snowplows to develop precision treatment recommendations for a specific segment of road. These recommendations are sent to the in-vehicle Parsons
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River