Skip to main content

Study for Dallas road development project

The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of
July 14, 2016 Read time: 2 mins
The 3499 Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International.

As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of access roads. The links will offer motorists low-speed access to homes and businesses along the corridor. The work in hand will include surveying the schematic layout, developing traffic studies (ramp installation, capacity evaluation and potential road widening), subsurface utility engineering (SUE) and noise management studies. Michael Baker will provide recommendations to ensure steady traffic flow and ease of access. The firm will also handle a public involvement and engagement campaign at city council meetings to apprise stakeholders of progress and updates.

“I-635 is a major thruway that loops around Dallas and connects thousands of commuters between downtown and the airport. As the surrounding areas continue to develop, our experts will focus on achieving results that allow motorists to safely and efficiently reach their destinations,” said Juan Contreras, office executive for Michael Baker’s Dallas office.

Michael Baker’s current contract to improve I-635 is part of a larger statewide evergreen contract that TxDOT awarded to the company in 2015. As part of the 2015 contract, the company is completing studies that examine the length of I-635 from the interchange at US 80 to the junction at I-20. The firm commence work on the I-635 contract in Q2 2016 with completion anticipated in mid-2018.

For more information on companies in this article

Related Content

  • RMD formwork for Qatar’s tallest bridge on Doha East Corridor
    July 6, 2016
    RMD Kwikform will be supplying tens of thousands of tonnes of its formwork and shoring for construction of Qatar’s tallest bridge on the Doha East Corridor project As well as the bridge, the Corridor contract comprises four interchanges at a total cost of US$612.5 million. Ashghal, Qatar's Public Works Authority, awarded the Corridor project to China Harbour Engineering Design and Construction. Built as a five-lane 11km bypass in Doha, the capital of Qatar, the project will also cater for a rail line
  • Developments in bridge monitoring technology
    July 9, 2012
    Advances in bridge monitoring technology should help ensure structural safety Highly productive, Fugro Aperio's ground penetrating radar system offers accurate scanning of bridge condition Bridge engineers can now benefit from a new technology designed to pinpoint shallow targets, such as masonry fixings, reinforcement bars or delamination between thin layers. This uses the latest high resolution ground penetrating radar (GPR) antenna and has been developed by Cambridge-based Fugro Aperio in the UK. Operati
  • Gerald Desmond Bridge opening in California
    October 5, 2020
    The Gerald Desmond Bridge in California is opening for drivers.
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin