Skip to main content

Study for Dallas road development project

The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of
July 14, 2016 Read time: 2 mins
The 3499 Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International.

As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of access roads. The links will offer motorists low-speed access to homes and businesses along the corridor. The work in hand will include surveying the schematic layout, developing traffic studies (ramp installation, capacity evaluation and potential road widening), subsurface utility engineering (SUE) and noise management studies. Michael Baker will provide recommendations to ensure steady traffic flow and ease of access. The firm will also handle a public involvement and engagement campaign at city council meetings to apprise stakeholders of progress and updates.

“I-635 is a major thruway that loops around Dallas and connects thousands of commuters between downtown and the airport. As the surrounding areas continue to develop, our experts will focus on achieving results that allow motorists to safely and efficiently reach their destinations,” said Juan Contreras, office executive for Michael Baker’s Dallas office.

Michael Baker’s current contract to improve I-635 is part of a larger statewide evergreen contract that TxDOT awarded to the company in 2015. As part of the 2015 contract, the company is completing studies that examine the length of I-635 from the interchange at US 80 to the junction at I-20. The firm commence work on the I-635 contract in Q2 2016 with completion anticipated in mid-2018.

For more information on companies in this article

Related Content

  • Break into machine guidance without breaking the bank
    January 10, 2024

    Watch the video

    You don’t get the name “The Dirt Ninja” without a serious obsession with all things heavy equipment and the technologies empowering what’s next for civil construction. For over a decade, Tom Gardocki, co-owner of New Era Excavation, has commanded hundreds of thousands of views on his YouTube channel—with a description that reads, "Anyone can run equipment, very few can operate.” Well said.

  • $1.9 billion for Oregon-Washington bridge replacement
    May 20, 2025
    A further $1.9 billion is needed for the Oregon-Washington bridge replacement.
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Bridge link underway in Texas
    March 22, 2012
    In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls. The Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges.