Skip to main content

Study for Dallas road development project

The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of
July 14, 2016 Read time: 2 mins
The 3499 Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International.

As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of access roads. The links will offer motorists low-speed access to homes and businesses along the corridor. The work in hand will include surveying the schematic layout, developing traffic studies (ramp installation, capacity evaluation and potential road widening), subsurface utility engineering (SUE) and noise management studies. Michael Baker will provide recommendations to ensure steady traffic flow and ease of access. The firm will also handle a public involvement and engagement campaign at city council meetings to apprise stakeholders of progress and updates.

“I-635 is a major thruway that loops around Dallas and connects thousands of commuters between downtown and the airport. As the surrounding areas continue to develop, our experts will focus on achieving results that allow motorists to safely and efficiently reach their destinations,” said Juan Contreras, office executive for Michael Baker’s Dallas office.

Michael Baker’s current contract to improve I-635 is part of a larger statewide evergreen contract that TxDOT awarded to the company in 2015. As part of the 2015 contract, the company is completing studies that examine the length of I-635 from the interchange at US 80 to the junction at I-20. The firm commence work on the I-635 contract in Q2 2016 with completion anticipated in mid-2018.

For more information on companies in this article

Related Content

  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • Texas set to approve extension to Texas 249 and US 290 in 2016
    January 5, 2016
    The Texas Department of Transportation is poised to give the go-ahead to US$1.27 billion worth of freeway to start this year. Plans include extensions to Texas 249 and US 290 in order to give Waller County greater access to major freeways and tollways, according to media reports. The biggest project, which is expected to begin this summer, is the addition of toll lanes to Texas 288, costing $800 million. Work will also be carried out at interchanges between the 288 toll road, Loop 610 and the Sam Hous
  • California traffic management system using simulation has successful trial
    May 16, 2014
    A complex online modelling system for integrating traffic management on the southern Californian road system has successfully completed a major operational trial this spring The "decision support system" uses the collection of data about the local interstate I-15 and many of the roads which feed into it or lead away from it, to build a comprehensive picture of traffic flows, working with a variety of city agencies, federal highway administration and services such as police and crash data. Data from e
  • New road to connect Manila’s airport in the Philippines
    May 15, 2013
    Plans are in hand in the Philippines to build a new road linking the international airport of capital Manila to the city and to other surrounding highways. The contract for the project was awarded to Optimal Infrastructure Development Inc (OIDI), a subsidiary of local firm San Miguel Corp (SMC). The company will build the new Ninoy Aquino International Airport (NAIA) Expressway in a deal worth some US$387.25 million for the Department of Public Works and Highways. OIDI will carry out the work under the PPP