Skip to main content

Study for Dallas road development project

The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of
July 14, 2016 Read time: 2 mins
The 3499 Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International.

As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of access roads. The links will offer motorists low-speed access to homes and businesses along the corridor. The work in hand will include surveying the schematic layout, developing traffic studies (ramp installation, capacity evaluation and potential road widening), subsurface utility engineering (SUE) and noise management studies. Michael Baker will provide recommendations to ensure steady traffic flow and ease of access. The firm will also handle a public involvement and engagement campaign at city council meetings to apprise stakeholders of progress and updates.

“I-635 is a major thruway that loops around Dallas and connects thousands of commuters between downtown and the airport. As the surrounding areas continue to develop, our experts will focus on achieving results that allow motorists to safely and efficiently reach their destinations,” said Juan Contreras, office executive for Michael Baker’s Dallas office.

Michael Baker’s current contract to improve I-635 is part of a larger statewide evergreen contract that TxDOT awarded to the company in 2015. As part of the 2015 contract, the company is completing studies that examine the length of I-635 from the interchange at US 80 to the junction at I-20. The firm commence work on the I-635 contract in Q2 2016 with completion anticipated in mid-2018.

For more information on companies in this article

Related Content

  • Securing safer transportation infrastructure through non-destructive technology
    June 16, 2014
    Kevin Vine reports on the use of non-destructive testing for structural analysis of bridges Seven years ago, the overpass collapse in Laval, Québec that led to the death of five people brought to light severe issues with the state of the country’s bridges and transportation infrastructure. More recently, a crack in the Champlain Bridge to Montreal that forced over 160,000 commuters to find alternate routes to work reaffirmed a need for greater emphasis on early detection before a crisis occurs.
  • Ontario’s Highway 413 revisited
    June 27, 2025
    Final property acquisitions are taking place for construction of Highway 413 in the Canadian province of Ontario to start later this year.
  • Stantec wins upgrade to Florida SR 91
    July 29, 2019
    Canadian contractor Stantec is to lead design work for a 16km upgrade and widening of State Road 91 in the US state of Florida. Work will turn the section of road through Lake County into price-managed lanes for improved travel reliability, according to the company which will be working for Florida’s Turnpike Enterprise, part of the Florida Department of Transportation. Turnpike Enterprise operates a 740km-system of limited access toll highways Stantec’s design for the project, with a construction cos
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.