Skip to main content

Study for Dallas road development project

The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of
July 14, 2016 Read time: 2 mins
The 3499 Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International.

As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of access roads. The links will offer motorists low-speed access to homes and businesses along the corridor. The work in hand will include surveying the schematic layout, developing traffic studies (ramp installation, capacity evaluation and potential road widening), subsurface utility engineering (SUE) and noise management studies. Michael Baker will provide recommendations to ensure steady traffic flow and ease of access. The firm will also handle a public involvement and engagement campaign at city council meetings to apprise stakeholders of progress and updates.

“I-635 is a major thruway that loops around Dallas and connects thousands of commuters between downtown and the airport. As the surrounding areas continue to develop, our experts will focus on achieving results that allow motorists to safely and efficiently reach their destinations,” said Juan Contreras, office executive for Michael Baker’s Dallas office.

Michael Baker’s current contract to improve I-635 is part of a larger statewide evergreen contract that TxDOT awarded to the company in 2015. As part of the 2015 contract, the company is completing studies that examine the length of I-635 from the interchange at US 80 to the junction at I-20. The firm commence work on the I-635 contract in Q2 2016 with completion anticipated in mid-2018.

For more information on companies in this article

Related Content

  • Upgrades underway for Tarrant tollway in Texas
    September 20, 2013
    Financing has been found to fund construction work on the North Tarrant Express (NTE) in Texas. The public-private partnership project for Segment 3A of the route will be carried out by NTE Mobility Partners Segments 3 LLC (NTEMP3). The rebuilding of the I-35W road close to Fort Worth will help reduce traffic congestion on the route at peak periods. The public-private partnership has been agreed between NTEMP3, the Texas Department of Transportation (TxDOT) and the North Central Texas Council of Governments
  • Texas DoT awards Atkins major contract
    July 18, 2014
    The Texas Department of Transportation (TxDOT) has awarded Atkins a major, six-year contract worth US$25 million. This will cover right-of-way (ROW) oversight, compliance review, and utility coordination services for transportation-related public-private partnership projects in the state. The deal calls for Atkins to serve as TxDOT’s management consultant, overseeing projects being hand;ed under development agreements, design-build contracts, and other delivery methods. Atkins has worked with TxDOT on a wid
  • ARTBA PPP awards include key Texas project
    July 22, 2014
    A $1.2 billion highway project in North Central Texas was recognised as a prime example of innovative transportation financing at an event held by the American Road & Transportation Builders Association (ARTBA). The 26th Annual Public Private Partnership (P3) Conference in US capital Washington was organised by ARTBA with its P3 Awards being presented in two categories, for entrepreneur of the year and project of the year. The former is given to at least one individual who has made an outstanding contributi
  • Texas highway deal for joint venture
    August 12, 2021
    An important Texas highway project is being carried out by a joint venture.